AMiBA
Engineering Telecon Minutes
13, Dec. 2001
Chair: K.Y. Lo
Participants: B. Martin, J. Payne, D. Emerson (USA), J. Peterson
(South Pole)
M. Sinclair, M. Kesteven, W. Wilson (Sydney),
H. Wang, T.D. Chiueh, M.T. Chen, Y.J. Hwang, H.M. Jiang, W. Ho, P. Shaw
(Taipei)
-
Jeff/
Jeff will ask Rapadas to provide cost break down for Meridian lag correlator.
-
Jeff/
Jeff & Rapadas will follow up to complete both lag correlator units
and send to Warwick ASAP.
-
Huei/
Huei will directly contact Joyce/TRW to get the module and technical details
he need for InP HEMT design.
-
Warwick/
Warwick will help to check the w-band LNA calibration data with Russell
for Huei.
-
Mike/
Mingtang Mike will figure out the size of enclosure he need to fit in the
control hardware, and Mingtang will follow up to figure out power supply
requirement and the specification of elecrical/electronical enclosure of
whole prototype system.
-
Mike/Bob/Philippe/ Mike&Philippe will specify the pedestal requirement
for prototype mount, so that Bob could follow up to prepare the site accordingly.
-
Bob/ Bob will follow up to get a firm quote from NRAO for OMT.
Next
meeting date/time: Thursday, 20, Dec. at 8:30AM Taipei time