Correlator:
One unit of the 16 lag correlator has been completed and tested at
Meridian, and its test result looks very promising. It should be OK for the
prototype, the big question is how much can the design be shrunk in size.The
correlator has a few flaws we should work out on the next iteration.
MMIC:
The InP HEMT foundry run contract and PO to TRW were signed
and issued by RCUH and fedex to TRW. But the export compliance office asked
us to apply for a TAA (Technical Assistance Agreement) that includes everyone
(non U.S.) who will come in contact with the MMICs,with the focus being the
AMiBA program. There appears to be testing, packaging, design review, and
integration tasks all supporting AMiBA, some utilizing foreign nationals.
Prototype
Mount :
Mike and Philippe are still working on the design for octagon
mount, and meanwhile West is preparing the engineering drawings as well.
LO/IF:
The mechanical design work on the module for LO and IF are nearly finish,
and start doing the machining work. Eugene and West will figure out what kind
of interconnecting cable should be used between that module and receiver..
30cm Dishes:
Bob got a new quote from CMA for producing 5 more units.
Its unit price is higher than the first two unit. Bob will follow up to check
the price with CMA.
Action
items