1. Warwick/ Warwick is dealing with IHP on getting the SiGe design package for ATNF at University rate, he will negotiate with IHP to get a copy for NTU as well.
2. Bob/ Bob will prepare a letter to TRW, and send it out to Fred, Huei and Paul for comments by tomorrow.
3. Jeff/Mingtang/Huei
- Jeff will resend the LNA block diagram to Mingtang, Huei and Paul.
- Mingtang and Huei will check the outside dimensions and the inside layout
of the drawing respectively, to ensure that design meet with our requirements.
- Jeff will help to get a quote of blocks from J & E as well.
4. Bob/ Bob will inform Todd Gaier the shipping address for the 4 LNA modules which JPL loan us.
5. Bob/ Bob will contact CMA tomorrow ,and to figure out when the two small dishes will be shipped to us.
6. Bob/ Bob will call on the persons in charge of the site and lab/office at Hilo shortly.
7. Mal/ As for set up a lab in Hilo, Mal will help to figure out the facilities requirement for the w-band HEMT LNA cold test.
8. Mike/Philippe/Paul an offline
discussion on the prototype mount design will be followed up