AMiBA PROJECT WEEKLY
MEETING MINUTES
Date: October. 12. 2000
Attendants: K.Y.
Lo, B. Martin, W. Wilson , Bob Sault, M. Sinclair, M Kesteven, H. Wang + 1
student, H.C. Lu, M.T. Chen, R. Wei, H.S.Li, C.H. Lu, Ronan Pelleau, P. Shaw,
J. Wang
Issues and Description |
Action by |
Output
|
MMIC- W- Band InP HEMT LNA |
||
1. Regarding the
Sub Hamonic Mixer¡¦s chip test at ATNF, Mal says the target date to do that
test should be in the end of this month. 2. Huei says that
the first design for the InP HEMT MMIC is ready, and now is waiting for the
wafer test data from JPL. Todd told him that he needs two weeks more
to work out that test data. Fred says he will visit Pasadena in a week time. So Huei will inform Todd
about Fred visit and ask him to arrange an appointment with the person in NASA who is responsible for
the export license approval.
3. As for the
0.1um GaAs HEMT, Huei says they will finish the layout touch up and send the
chip out to TRW by Oct. 20. Eugene says he just finishes the final
layout last night; he will give it to Huei to review. 4. As to the
export license application for the InP HEMT of TRW, Huei says Joyce told him
that the review process is still ongoing at the State Department He is
expecting to get a final decision on that issue by early November. 5. Wave-guide
filter ¡V Huei received some
experiment data from Mal by fax, Mal will provide some drawings to Huei as well, and Huei will forward those data
and drawings to Prof. Wu. This would be a good reference to Prof. Wu to develop his design in
parallel. (Mal is modifying the existing design of 80 GHz to 85 GHz as we need.) As for the prototype receivers,
Mal suggests Mingtang to investigate if he can find the required filters in the market. 6. Regarding the
purchasing for the 4 units of 82~106 GHz amplifiers from NRAO, J. Webber's
secretary told us that the export license application is under
reviewing by the Export Bureau smoothly without problem. She asks us to release the purchase order to NRAO
ASAP. 7.Mal
says that he received a reminder the wafer is back this week, the plan is to
test more chips in the
next couple of weeks. All the hardware of the amplifiers blocks in
completed, so he expects to start to test that w-band InP LNA chips sometime
by end next week. So he hopes to work out some test results in three weeks. 8.Huei
says Specek inform him that the amplifiers they made have some deviations
with the required specs. Mal and Warwick think those deviations seem within
an acceptable tolerance and may not serious influence the design criteria of
the whole system, but we should ask Specek to improve such defects further.
Huei will contact Specek to find a solution. |
H. Wang M. Sinclair H.Wang K.Y. Lo H.Wang Y.J.Eugene H.Wang M.Sinclair H. Wang M.T. Chen H.C. Lu M. Sinclair H. Wang |
ongoing ongoing Oct. 20 ongoing ongoing ASAP ongoing ASAP |
Lag Correlator Hybrid |
||
1. Jeff says he
did some simulation on the wire attenuator and alumina, he sent over some
simulation data to Warwick by email a couple minutes ago. The next step is to
see the noise of mixers, he is ordering a couple of amplifiers to fit in the
two independent noise signals to mixers, and then to watch what the noise of
the output, and what is the offset. And mean while he is working on making
the 16 lag correlators. 2. Warwick says
that the HBT Gilbert Cell multiplier wafer has come back from TRW, and has
been tested at this moment, so should have that result soon. As to the lag
correlator built from commercial parts is starting to go. 3. Paul, Eugene
and Leo will go to see the "Taitronic Exhibition" and visit the ACX
Company's booth as well this afternoon. 4. As to the
design work for prototype, Warick says it¡¦s coming together, he got one
element going and the secondary one at this moment, he is calculating on
that, and putting on the other, signaling them and see how they are
going. 5. Ray Wei says he
has simplified the circuit and also completed the simulation for the IC
circuit. There are some problem about the frequency mismatch between master
PLL and slave VCO, so is trying to solve these problems. After that he will
start to design the digital part. 6.
Huei says that they just finish the design work on the Gilbert Cells
Multiplier, but it probably would not
meet with the design goal, and right now they are preceding the touch
up stage, and it will be sent out in 2 or 3 weeks. In the mean time, he is
studying the HBT design, because they
have another run for the GaAs HEMT by late Dec. So he hopes to get some
experience on the HBT design
also. 7.Warwick
says he has been talking to Prof. Chiueh about the packing process for prototype;
he has a regular contact with Prof. Chiueh. He will forward the communication
he have Prof. Chiueh to Paul. So Paul can keep on tracking
these things. |
J. Peterson W.Warwick P. Shaw W. Wilson R. Wei H. Wang P. Shaw |
Ongoing ongoing ongoing ongoing ongoing ongoing ongoing |
Receiver |
||
1. Mingtang
inputs a draft receiver layout on his web page, the signal entrance and the
height of the main chamber is not decided yet. Leo is
working on the component arrangement with him. As to the interface between receiver and mount,
Bob will sent a platform layout drawing to Mingtang by next week. 2. Yugene says he only got a sheet of specs from
the Atlantic Microwave Company about the OMT, they only guarantee the band
width of 94~96 GHz. Bob suggests Yugene that he should talk to NRAO people
about the OMT while he visiting there. Bob will follow up that as well. |
M.T.Chen B. Martin Y.J. Hwang |
ongoing next week ongoing |
LO/IF |
||
Due to the telephone line broken down, Eugene will
write a detail report on the Photonic LO system and the Calibration system. |
Y.J. Hwang |
ASAP |
Platform/mount/dishes |
|
|
1.Bob will send over a
draft layout for mount and dishes to everyone in a week or two after. 2.Jeff doesn¡¦t think the caesarian
could work with the 30cm antenna due to its high ground pick up. He will do some quantitative analysis to demonstrate this
case. 3.Regarding the height of
ground shield for our antenna, Bob requests Michael to ask their expert to
verify what size are good for us. |
B. Martin J. Peterson M.Kesteven |
ASAP ASAP ongoing |
Site acquisition |
||
Bob says that he plans to
visit Mauna Lao Observatory by the second week of November, to take a look on
site and see what the possibility is and how we proceed. |
B. Martine |
Ongoing |
Prototype
Specification and Project Book |
||
1. He got some
contribution receiving drawings last day or two, we he will incorporate all
of these into a revised draft, he will send it to Fred and Paul by the end
of week. As a center source of all documentation there, and that is what has to be worked
with others for further contribution on all chapters. Fred will take over the question with. 2. Bob and Fred asks Michael,
Ravi and Bob to take a close look at some technical related science issues, e.g. UV coverage with current design on platform and drift
scanning techniques, observation strategy and photonic delay line. 3. Philippe's student
generates some of layout drawings for dish, Paul will put them on web site
for everyone to look at. |
B. Martin M.Kesteven P. Shaw |
Ongoing Ongoing ASAP |
Travelling |
||
Bob / Oct.9 ~ Oct. 26 |
|
|
Next Meeting |
||
8:30pm EDT,
8:30am Taiwan, 10:30 Australia, 5:30pm Tucson/Thursday/ Oct. 19. 2000 |