AMiBA PROJECT WEEKLY MEETING MINUTES
Date: 10/August/2000
Attendants: B. Martin, H. Wang & 2 students, T.H. Chu, M. Sinclair, W. Wilson, J. Peterson, H.C. Lu, M.T. Chen,Yugene Hwang , P. Shaw, J. Wang
Issues |
Description |
Action by |
Output |
MMIC- W- Band InP HEMT LNA |
Status of NRAO. |
M. Sinclair
H. Wang
M. Sinclair
H. Wang
B. Martin |
On going
ASAP
17 August
ASAP
ASAP |
Lag correlator hybrid |
will write and email about for B. Martin and W. Wilson to consider the possibility way to revise the Tree Structure of design , to get more advantage. He asks everybody to look around and to discuss it in the next week. |
J. Peterson
W. Wilson
J. Peterson W. Wilson |
17 August
on going
17 August |
Receiver |
M. Sinclair said that M. Kesteven is still away in Manchester, he has nothing to report for this week. He might be back in a week or two. Mal spoke to Graham Johns; he is an antenna export. He is quite happy to take on that small project. When M. Kesteven back, he will talk more deeply with Graham to exam the problem, and to get something rolling with our specification. |
M. Kesteven |
|
System network |
H. C. Lu got the spreadsheet from George Gross; he just did try error to see if the overall system noise is still good or not. The spread sheet form George is only consider the gain of each stage. H. C. Lu and Yugene will carefully study the calculation for the whole system network. |
M. Sinclair |
ASAP |
Work plans |
P. Shaw will coordinate with each responsible person to generate a work plan respectively, collecting and distributing them to everybody for review and comment through email. |
H. Wang, T. H. Chu M. T. Chen B. Martin H. C. Lu Y.J. Hwang S.S.Shen P.Shaw |
17 August |
LO/IF |
talk with J. Payne to settle it. Bob reminds Lio and Yugene to set up a plan , including what you want to accomplish when you are there, also what components you need, you should bring with you. Lio said they already ordered a photonic mixer, the target delivery date is in this September. So they will bring it with them to NRAO and test it at NRAO’s lab. For the other laser components, they are looking for some catalogues from suppliers to check out what might be useful for us. They will write down the first try components we need to order before they go to NRAO. So they can discuss it with J. Payne to finalize the components list. When they come back , they can start to purchase them immediately. 2. B. Martin said that in this early November, there will be a Photonic LO Meeting held by Nobeyama and NRAO in Tucson, it would be good to join there, particularly Yugene and Lio. 3.B. Martin said that he heard more noise about the background and cross-talk problem from Manchester, it appears more and more argument to go with the traditional separates elements rather than the common platform approach. If we go that, we have to do something very different. It appears that we should go with the fiber optics, and find someway to build the delay tracks. J. Payne has a same idea on that too. As a result, the IF components really should not be ordering, held on for a while. Bob suggests somebody start looking at a possible fiber optics IF components. W. Wilson said that they have been looking in this problem a little bit on their own purpose to compare LO what wide band links there, so it could be some parallel develop there. Warwick said we could get the components to sort out the 20GHz bandwidth, there are not cheap but are available. Warwick agrees to make a summary of a survey on the available components for the photonic LO system, he will send it to Yugene and distribute to everybody. The delay line is a complete new issue for us; it will effect the system network, including system calculation, system diagram, cost and prototype, etc. |
H. C. Lu Y. J. Hwang B. Martin
W. Wilson |
ASAP |
Travelling |
K.Y. Lo/ 3 August ~ 3 September ; T.H. Lu & H.C. Lu/ 21 August ~ 26 August |
||
Next Meeting |
8:30pm EDT, 8:30am Taiwan, 10:30 Australia, 5:30pm Tucson/Thursday/17 August 2000 |